We are pleased to present an update from the construction site of the RC “Shchaslyvyi” (Lviv) in Bihova Street.

Among the works that have been completed in full or in part:

• concreting of the bowl for the fountain;

• finishing of the floor and walls of the basement corridors has been completed;

• installation of equipment for domestic and fire pumping stations in the building has been completed;

• cold water pipelines were laid to the premises of the 1st floor;

• installation of doors in the basement to the pump room, electrical room, and fan room;

• landscaping works along the building to the entrance to the hall and from the end of the building;

• tiling of the facade of the 1st floor has been completed;

• finishing of the hall, installation of mailboxes;

• hanging bars in the places of installation of fire valves;

• cleaning of the premises of the public usage places and the hall.

The next planned stages of work include:

• improvement works: sidewalk around the building, extension of the road behind the building;

• installation of smoke removal, ventilation, and air supply fans on the roof;

• waterproofing works in the fountain bowl, laying of networks to the fountain;

• installation of floor numbering in elevator halls and stairwells;

• installation of decorations in the lobby;

• installation of fire system equipment.

Make an appointment with the sales department in order to see how the construction is going and to choose a commercial space, storage room, parking space or the last apartment from the developer.

Contact phone number: +380684308208.