CONSTRUCTION OF THE RC "SHCHASLYVYI" (LVIV): MARCH 2024

22.03.2024

We are pleased to present an update from the construction site of the Shchaslyvyi residential complex in Lviv, located in Bihova Street.

The following works have been completed:

・insulation of the house basement and sanding of the car park and the house;

・tiling of the floor in the public usage places (floors 4, 5, 8, 9);

・applying decorative plaster to the walls of the public usage places (10-17 floors);

・installation of inspection hatches on water closets and low-voltage points;

・installation of a passenger elevator;

・installation of the Armstrong suspended ceiling frame (12-17 floors);

・installation of power supply cables for fire systems (fire panels, manual alarm button, ・・in-apartment smoke detectors).

The next planned stages of work include:

・waterproofing of the car park walls;

・installation of a thyroid membrane on the basement of the house, sanding around the house to the bottom of the landscaping pie;

・installation of gas meters, gas supply to the system;

・tiling the floors of the public usage places (4-9 floors);

・puttying of the walls in the public usage places (3-7 floors);

・applying decorative plaster to the walls of the public usage places (8-9 floors);

・installation of window sills in the stairwell;

・installation of power cables for fire systems in the building (6-13 floors);

・installation of doors to commercial premises on the 1st floor;

・installation of electrical networks inside the building;

・installation of the Armstrong ceiling subsystem (8-11 floors).

To see how the construction is going and choose one of the last apartments, as well as a commercial space, storage room or parking space, make an appointment with the sales department.

Contact phone number: +380684308208.